Pulsar Logistics Park Fontanar R-2 platform B
Location:
Fontanar (Guadalajara)
Communications
45 min from Madrid / Airport
Direct exit through the CM-1008 and link with A-2 and R-2
DESCRIPTION:
This sectorized logistics platform is the product of a partial rehabilitation that has a warehouse for medium 5 and high 7 risks. Prefabricated concrete structure and enclosures, interior and exterior concrete floors, pump room and own fire-fighting tank.

Total area:
22.959 m2

GLA
11.893,17 m2

Warehouse:
8.918,81 m2

Offices:
2.330,01 m2

Free Height:
12 m

Docks:
19
Contact us